Rewrite a fully new long article using the information from
By Luis Montoya
AUSTIN, Texas — State Senator Juan “Chuy” Hinojosa, D-McAllen, is praising a major bi-national and state financial package aimed at modernizing canal infrastructure and capturing millions of gallons of water currently lost to leaks and seepage across the Rio Grande Valley.
The Texas Water Development Board (TWDB) authorized $69.5 million in Water Supply Infrastructure Grants (WSIG) for canal lining and pipeline conversion projects across Hidalgo and Cameron Counties. Matched with funds from the North American Development Bank (NADBank), the U.S. Bureau of Reclamation, and local irrigation districts, total investments for the region will reach $163.6 million across 17 distinct projects managed by 12 irrigation districts.
Once completed, the modernization effort is projected to save approximately 44,188 acre-feet of water annually—roughly 14.4 billion gallons. For comparison, the City of McAllen uses about 24,500 acre-feet per year.
Legislative Action Delivers Results
Senator Hinojosa, who co-sponsored House Bill 500 during the 2025 legislative session, highlighted the collaborative efforts between local water managers and legislative leaders to secure the funds. HB 500 appropriated $1.038 billion to the TWDB for statewide water infrastructure, with agency leadership earmarking up to $100 million specifically as matching funds for NADBank’s Water Resiliency Program.
“I appreciate the TWDB setting aside funds for this historic funding opportunity to modernize canal infrastructure in the Rio Grande Valley,” Hinojosa said. “Our region continues to face significant water challenges, and all strategies to conserve and manage water must be considered. For years, and leading up to the 2025 session, many irrigation district leaders met with me, members of our legislative delegation, state leaders, and state agencies about the need to modernize our canals. We listened and took action.”
Hinojosa emphasized the real-world impact the canal lining and conversion projects will have on regional agriculture and urban communities.
“I commend our irrigation districts’ boards, their managers, and staff for working with NADBank and the TWDB to submit their applications and secure these funds,” Hinojosa added. “Many of these canals are losing huge amounts of water through seepage and leaks. These projects will ensure more water reaches our farms and communities instead of soaking into the ground. The water we will save will make a positive difference for years to come.”
State and Binational Partnership
The WSIG program allows state grant funds to cover roughly 50 percent of eligible project costs, with NADBank providing $75.4 million through a mix of grants and loans. The remaining balance—nearly $18 million—is funded through local irrigation districts and the U.S. Bureau of Reclamation.
Governor Greg Abbott pointed to the broader legislative effort to protect Texas water supplies amidst ongoing drought conditions.
“Water is a precious resource that Texas must safeguard,” Abbott said in a statement. “Last session Texas delivered the largest water investment in state history: $20 billion for new supply and infrastructure, plus more than $1 billion in House Bill 500 grants… These projects will conserve nearly 44,000 acre-feet of water each year and deliver more reliable water to farms and families in South Texas.”
TWDB Chairwoman L’Oreal Stepney expressed enthusiasm for the joint funding approach. “We are excited to partner with NADBank to maximize our combined resources and advance our shared commitment to helping Rio Grande Valley communities conserve their water resources and improve the reliability of their water supplies,” Stepney said.
Speaking at the NADBank Summit 2026, NADBank Managing Director John Beckham emphasized the speed and coordination required to roll out the Water Resiliency Fund (WRF).
“By partnering with and leveraging resources from the Texas Water Development Board, Bureau of Reclamation, and the irrigation districts, we will maximize the impact of every dollar invested to conserve precious water resources and provide a reliable water supply for Rio Grande Valley communities,” Beckham said.
Mexican Ambassador to the United States Roberto Lazzeri Montaño noted that border-wide water security requires cross-border collaboration, pointing out that 60 percent of Mexico’s 112 project proposals under the WRF came from states along the Rio Grande/Rio Bravo.
“Water security has become one of the most critical challenges facing the future of the U.S.-Mexico border region,” Ambassador Lazzeri said. “As drought conditions become increasingly severe and prolonged, the Water Resiliency Fund demonstrates the value of binational cooperation and strategic investment in strengthening the future of our shared border.”
Project Funding Breakdown
Below is the complete list of the 17 approved projects receiving TWDB Water Supply Infrastructure Grants across Hidalgo and Cameron Counties:
|
Irrigation District |
Project Description |
Approved TWDB Grant Amount |
|
Cameron County ID No. 6 |
Canal lining improvements |
$6,500,000 |
|
Cameron County ID No. 2 |
Canal lining improvements & canal-to-pipeline conversion |
$6,000,000 |
|
Delta Lake ID |
Pump station rehabilitation & canal-to-pipeline conversion |
$2,215,043 |
|
Delta Lake ID |
Canal-to-pipeline conversion |
$529,089 |
|
Delta Lake ID |
Pump station rehabilitation & canal-to-pipeline conversion |
$1,023,802 |
|
Donna ID |
Canal lining improvements |
$1,150,000 |
|
Engelman ID |
Canal-to-pipeline conversion |
$160,000 |
|
Harlingen ID Cameron County No. 1 |
Pump station relocation & canal-to-pipeline conversion |
$1,374,816 |
|
Harlingen ID Cameron County No. 1 |
Canal-to-pipeline conversion |
$7,749,388 |
|
Hidalgo & Cameron County ID No. 9 |
Canal-to-pipeline conversion |
$6,000,000 |
|
Hidalgo County Consolidated WCID |
Canal lining improvements |
$5,000,000 |
|
Hidalgo County ID No. 1 |
Canal lining improvements |
$5,040,671 |
|
Hidalgo County ID No. 1 |
Canal lining improvements |
$4,625,164 |
|
Hidalgo County ID No. 6 |
Pump station & canal lining improvements, pipeline conversion |
$3,137,922 |
|
Hidalgo County ID No. 6 |
Pump station construction & canal lining improvements |
$8,005,136 |
|
La Feria ID Cameron County #3 |
Canal-to-pipeline conversion |
$6,000,000 |
|
United ID |
Canal lining improvements |
$5,000,000 |
|
TOTAL TWDB WSIG FUNDING |
$69,511,030 |
Source: Texas Water Development Board & North American Development Bank
make sure the article is SEO-optimized following all the SEO Guides, from Focus Keyword to H2 and H3 titles and so on.
the article must explain all the details in a very clear and engaging structure.
very important: Use external links for keywords and sentences inside the article you will generate to boost the SEO.
Avoid writing any author related or donation related texts.
Avoid writing what you did in the articles because the article is published for visitors to read.
